On the other hand, documenting recalculations for the following credits can be much more difficult:

SSc6.1: Stormwater Design—Quantity Control; 

SSc6.2: Stormwater Design—Quality Control; and 

SSc8: Light Pollution Reduction. 

Credits
Project phase
Credit tip type