Conducting a Phase I ESA during the pre-design or schematic design stage can give you enough time to complete Phase II and remediate the site before construction begins, if needed. Waiting to do site remediation until after construction has begun can change the construction schedule and therefore be costly. 

Credits
Project phase
Credit tip type