Energy savings is determined by comparing actual metered or measured energy use to the projected energy use of a baseline building using the project's actual operating conditions.

Energy Savings = Projected Baseline Energy Use – Post-Construction Energy Use (actual metered energy use).
Post-Construction Energy Use is determined by utility metering or submetering, or by using an energy simulation model of the projected building.

Credits
Project phase
Credit tip type