Log in

The mechanical engineer and architect identify densely and non-densely occupied spaces as defined by LEED and determine the quantity and locations of all monitoring devices, and integrate them into the HVAC system. The mechanical engineer should verify th

The mechanical engineer and architect identify densely and non-densely occupied spaces as defined by LEED and determine the quantity and locations of all monitoring devices, and integrate them into the HVAC system. The mechanical engineer should verify that the monitors are designed to interface with a BMS system or trigger an audible or visual alarm if CO2 concentrations or ventilation rates fall outside of the required range.

Project phase: 
Credit tip type: