The civil engineer and the landscape architect design the landscape and stormwater systems to maximize infiltration and collect water where possible. These systems must be designed based on the watershed region, and the BMPs employed must in combination remove 80% of the TSS for the post-construction design. The civil engineer will need to verify that the design meets the LEED requirements.
Credits
Project phase
Credit tip type