Absorptive ceiling, wall and floor materials will help projects meet RT requirements. Design the placement of absorptive material based on the space programming and layout. For example, the design for a lecture hall should not include absorptive material above the lecturing position, which would absorb the lecturer’s voice instead of reflecting it into the audience.
Credits:
Project phase:
Credit tip type: