The mechanical engineer begins preliminary ventilation rate calculations during project programming in order to set ventilation quality goals for particular spaces and occupancies. The area of a given multi‐zone system should be broken down by ventilation zones, and all zones within that system must meet the minimum breathing zone ventilation air requirements as per ASHRAE 62.1‐2004. For a typical office space, the mechanical design consists of multiple ventilation zones for which compliance would need to be shown on an individual basis.