This credit is achievable for projects that have a fair amount of outdoor space. Work with the landscape architect and architect early in the design process to incorporate places of respite into the site design.
Consider noise sources (mechanical systems, vehicles, etc.), proximity to heavy foot traffic, accessibility, existing tree canopy, and security when it comes to site placement.
What’s New in LEED v4
- A new requirement that 25% of all qualifying total outdoor area must be vegetated at the ground plane (not including tuft grass) or with overhead vegetated canopy has been added to ensure that vegetation is available to provide additional benefits.
Credits