Note: This pilot credit was closed for new registrations as of March 1, 2012.

This prerequisite is one of several new credits in the Performance category designed to track actual LEED building performance.

Additional Questions

1.    Did you find the projected annual water use calculations for sub-metered items cumbersome, or are these calculations a standard part of your design and con-struction process?

Credit Submittals

General

  1. Register for Pilot Credit(s) LEEDuser.com, and participate in online forum
  2. Submit the feedback survey using the link on the USGBC.org credit page; supply PDF of your survey/confirmation of completion with credit documentation

Credit Specific

Provide the following:

  • Water flow diagram indicating all sources and uses of water, expected flow rates and proposed meter locations
  • Floor plans showing locations of meters and sub-meters
  • Product data (shop drawings) indicating meter has capabilities of meeting pre-requisite requirements.
  • Commissioning agent, Design Professional or Meter manufacturer’s statement that meter has been correctly installed and calibrated.
  • Basic calculations showing project's annual water use for the features called out in the prerequisite.
Credits