Update: USGBC has closed Pilot Credits 5 and 6 to new project registrants as of 1/12/11.

This prerequisite (PC5) and accompanying credit (PC6) were introduced to elevate integrative design to specific, actionable and measurable steps in the design process rather than assume that project teams will engage in integrative design in a meaningful way.

Developed for health care

The NC, CS, CI, and Schools. Since they are actual credits in LEED for Healthcare, they can't be pursued as pilot credits in that system.

Credit Submittals

General:

  1. Register for Pilot Credit(s) here
  2. Register a username at LEEDuser.com, and participate in online forum
  3. Submit the feedback survey using the link on the USGBC.org credit page; supply PDF of your survey/confirmation of completion with credit documentation

Credit Specific:

Currently, credit submittals have not been finalized; as the pilot continues, these require-ments will evolve. At this time, please submit one to two pieces of documentation to sup-port your claims, and assist in the development of the submittals.

Both credits

  • List of decisions proposed during the design charrette, compared with the final design decisions
  • List of paid/contracted team members, along with the dates for meet-ings/construction/participation

Pilot Credit 5

  • Document the Preliminary LEED Meeting, which must happen no later than 50% Design Development. Clarify whether the identified four key project team mem-bers is derived from the list under Integrative Project Team and actually is the In-tegrative Project Team.
  • Preliminary LEED Action Plan and Checklist; participants in the Preliminary LEED meeting (names and project roles/responsibilities)
  • For Integrative Project Team: require a minimum of 4 PLUS the Owner/Owner’s representative (change from 4 including Owner/Owner’s rep). Include roster of In-tegrative Project team with names and project roles/responsibilities, along with a log of participation
  • A mission statement that addresses triple bottom line considerations; recom-mended that the triple bottom line considerations be carried over into this more generic Integrative design process.

Pilot Credit 6

  • Ensure that your project is using the most recent version of the ANSI MTS Guideline
  • Conduct and document regular meetings with project team, for a minimum of 12 meetings with the integrative design team

Additional Questions

  • How cost-effective was pursuing this credit, in relation to other credits?
  • Are these strategies you’ve already pursued on projects prior to this submission?
  • Are there any professionals not represented in our list for an integrative project team?