It is typically better to use project-specific diversion data when you can get it, and this data should typically be accepted in a LEED review. However, there are other options.

There are LEED Interpretations such as LEED Interpretation #10060  made on 5/9/2011 that allow use of a facility-wide recycling rate, if approved by local regulators. On similar lines, a 5/9/2011 addendum added this note to the LEED Reference Guide: “For commingled recycling the average annual recycling rate for a sorting facility is acceptable for recording diversion rates only when the facility's method of recording and calculating the recycling rate is regulated by a local or state government authority.”

Question
The waste management facility we are using is providing us with monthly documentation specific to our waste, showing 80% diversion. They also have a published, facility-wide rate of roughly 20%, and they have no published rate for construction waste. Will our diversion rate be accepted, or do we need to use a facility with an appropriate published rate?
Credits