Waste generated off-site, even for modular construction and pre-fabrication of major assemblies is not accounted for in the MRc2 calculations. MRc2 looks only at the management of waste generated onsite.
Question
How is construction waste accounted for when utilizing off-site construction, like modular construction or pre-fabrication of assemblies?