CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Michelle Rosenberger on
Can a Core & Shell building with only restrooms built out that has only exhaust fans and gas fired freeze protection units comply with this credit?
Integrative Process-Simple box C&S v4
CS-v4 IPc1:Integrative processposted by Giuseppina Amorusi on
Hi all, I and my team are working on LEED v4 BD+C project, and we're looking to pursue the Integrative Process credit for Core and Shell certification. We have an existing building where we will do
CC&R
ND-Plan-v4 GIBc17:Light pollution reductionposted by William Gagnon on
Hello, Any examples of CC&Rs relative to light pollution reduction?
Pre-Consumer Recycled Content
EBOM-v4 MRc1:Purchasing - ongoingposted by Claire Bannister on
How is pre-consumer recycled content calculated in v4? In v2009, there were columns for both pre- and post- consumer.
Aersol Adhesives
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Alice Reeves on
I have evidence that the aerosol adhesive I am using is below the % VOCs per weight limit provided in the LEED Reference Guide for Aerosol Adhesives.
1.5 FAR for a residential project
NC-v4 SSc2:Site development - protect or restore habitatposted by Katherine Ann Resurreccion on
Hi, The credit states that projects with 1.5 FAR will allow vegetated roof or roof gardens to be qualified in the area calculations.
Water lilies
NC-v4 SSc3:Open spaceposted by Katherine Ann Resurreccion on
Hi, The project will have water features and water lilies on it. Can somebody confirm that we can measure the whole water feature area to contribute as vegetated space?
Enclosure Cx Provider
NC-v4 EAc1:Enhanced commissioningposted by Brett Farbstein on
The project is pursuing v4. A 3rd party Cx provider has been engaged for MEPs.
Additions, Separate Utility Building, Campus Site
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Michele Helou on
I'm trying to verify an acceptable LEED Project Boundary for a LEED NC v3 project.
Monitoring requirement for Residential Projects
NC-v4 EQp1:Minimum indoor air quality performanceposted by Arpan Bakshi on
Question about meeting this prereq in Residential Projects - v4 requires one of three types of monitoring for naturally ventilated projects - exhaust airflow, alarm on openings, or CO2 with alarm.