Forum quick links
Recycled content in Broadloom Carpet
NC-2009 MRc4:Recycled Contentposted by michael giannini on
I was redirected to this forum from Tristan Roberts i am trying to get some important info on recycled content in broadloom .
Views through atrium
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Mike D on
If an office project space has a glazed atrium in the middle of the floor plate, do the views of the office from one side of the atrium to the other side count in the Views credit?
Destination resort and need for bike racks?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Crista Shopis on
My client is building a destination resort which includes a hotel, golf course, spa, etc. I understand the need for bike racks for resort staff who will be commuting locally.
Alcoholic beverages
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Emmanuel Pauwels on
Does food and beverages include alcoholic beverages as well or only soft drinks and water?
Appeal process
posted by Marcio Alberto Casado Pereira on
Hi folks, It's our first time making an appeal and we are not quite sure about the correct procedure. We are appealing the prerequisite EAp2.
Include or Exclude a classroom auditorium
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ashonta Langdon on
We are doing an addition to a classroom building on a college campus. A ~100 seat auditorium style classroom makes up about 25% of the regularly occupied space of the building.
We have a resort project,
posted by Eunju Park on
We have a resort project which has 4 buildings excluding villas in different phases. There are villas in the resort but we are intending to get LEED NC silver certification without villas.
Soil Materials, Site work costs contribute to total cost?
NC-2009 MRc4:Recycled Contentposted by Matthew Martin on
Should I include loads of soil, stone, pipe bedding materials, underground pipe, catch basins or other site work materials to the total cost of materials?
Qualifying spaces must meet IEQ c5
Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patientsposted by yanghee pierce on
SS c9.2 says 'Qualifying spaces must meet the requirements for outdoor air quality enumerated in IEQ c5.’ Does this mean a project has to meet IEQ c5 in order to achieve SS c9.2?
Building Metering and Utility Metering
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Becky Dix on
On a higher ed project, there is proposed metering of all energy and water usage for the LEED building that can be read from the building automation system.