Forum quick links
raised floor
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Florinda Garcia on
does the raised floor has to meet the floorscore requirements?
extraction location for petroleum based raw materials
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Melissa Vernon on
I am working on documentation for this credit but need some advice.
extraction location for petroleum based raw materials
NC-2009 MRc5:Regional Materialsposted by Melissa Vernon on
I'm cross posting my question here, as it pertains to LEED v4 raw material sourcing, and in documenting regional materials, others may have encountered the same issue. I am working on documentatio
Free Thermal Comfort Tool
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Julia Weatherby on
Many thanks to Christopher Schaffner for linking in his post below to the Berkeley CBE free online comfort tool at: http://cbe.berkeley.edu/comforttool/ I use the Windows XP operating system, and
Mechanical enclosure non-roof?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Nicole Kimoto on
Can we include the concrete paving provided in our project as part of the non-roof area?
Sustainable Sites credit in LEED for Homes
posted by radwa rostom on
Hi all, I have an inquiry in the sustainable sites category. in 1. site stewardship, point d "build on a lot of 1/7 acre or less, or 7 units per acre" what does "lot" mean?
Military installation with male dominated population
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Joanna Switzer on
I am part of a team working on a multiple building complex LEED project at an Army Infantry installation.
SS7.2 question about form
Schools-2009 SSc7.2:Heat Island Effect—Roofposted by John Paul Chulliyil on
Hi all, I am in the middle of working on the SSc7.2 roof for and a bit confused. We are using a High albedo material covering 100% of the roof.
Development density - site area
NC-2009 SSc2:Development Density and Community Connectivityposted by John Edwards on
I have a project that has 30 stories of above-grade office/retail/parking structure and 3 levels of below-grade parking.
Product Catalog or Brochure of Building Equipment.
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Sangmin An on
Hello, I have a few questions regarding how to demonstrate the amount of refrigerant charge. The questions are as below. 1. Situation We are preparing design phase review.