Forum quick links
Entry way mat sizes?
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by John Paul Chulliyil on
Hi all, on our project we are looking at using the 10' long walk off mat, as for the width we would use a typical 4' -6' size, but thinking about it once a person walks into the space they would n
EAp2 Documentation Using EnergyPro
NC-2009 EAp2:Minimum Energy Performanceposted by Gilberto Sanchez on
The EAp2 worksheet requires Title 24 sheets PERF-1, ECON-1, and UTIL-1 when the energy modeling program is EnergyPro.
Distance by sea using nautical miles(by sea)
NC-2009 MRc5:Regional Materialsposted by Benjie Herrera on
In using the option 2 , can I use the nautical miles divided by 15 to arrive at the distance by sea?
Average Pressure Differential Calculation - Underground Parking
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Nathan Lee on
We have 6 Floors of Underground Parking on a high Multi-Use Tower.
Roof terrace
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Tanja Arnesson on
I'm wondering if the roof terraces shuold be included in the calculations or excluded like machanical equipement and skylights?
Prerequisite 2 & Credit 1
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Paula Hernandez on
Does anybody know if projects outside EEUU are elegible for Energy Star Rating?. I am working in an EBOM Project in Argentina and I am not sure if it will be Case 1 or Case 2. Thank you.
Duct Glassfiber's Adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Guillermo Hernandez Espinoza on
In which category the duct used for the HVAC duct's insulation falls into?. Thanks
Pilot Credit 10
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Alicia Villanueva on
Hallo, My team and I have reduced water use in a project through high-efficient flush fixtures by 67%. In addition, 100% of the water used for sewage conveyance is treated on-site to tertiary stand
Calculating FTE- LEED for Healthcare
NC-2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
My project is a surgical suit additions. We are calculating patients as: 1) transients 2) outpatients The only transients for the project are the patients.
Multipurpose Space in Basement Regularly Occupied?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Nelina Loiselle on
Thank you Todd for answering my previous question- Now I have another one.