Entry way mat sizes?

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  John Paul Chulliyil   on 

Hi all, on our project we are looking at using the 10' long walk off mat, as for the width we would use a typical 4' -6' size, but thinking about it once a person walks into the space they would n

1
Thu Apr 25, 2013, 7:55 pm

EAp2 Documentation Using EnergyPro

NC-2009 EAp2:Minimum Energy Performance
posted by  Gilberto Sanchez  on 

The EAp2 worksheet requires Title 24 sheets PERF-1, ECON-1, and UTIL-1 when the energy modeling program is EnergyPro.

1
Thu Apr 25, 2013, 8:01 pm

Distance by sea using nautical miles(by sea)

NC-2009 MRc5:Regional Materials
posted by  Benjie Herrera  on 

In using the option 2 , can I use the nautical miles divided by 15 to arrive at the distance by sea?

1
Wed May 1, 2013, 3:38 pm

Average Pressure Differential Calculation - Underground Parking

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Nathan Lee  on 

We have 6 Floors of Underground Parking on a high Multi-Use Tower.

0

Roof terrace

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Tanja Arnesson  on 

I'm wondering if the roof terraces shuold be included in the calculations or excluded like machanical equipement and skylights?

1
Fri Apr 26, 2013, 1:54 pm

Prerequisite 2 & Credit 1

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Paula Hernandez  on 

Does anybody know if projects outside EEUU are elegible for Energy Star Rating?. I am working in an EBOM Project in Argentina and I am not sure if it will be Case 1 or Case 2. Thank you.

1
Fri Apr 26, 2013, 12:35 pm

Duct Glassfiber's Adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Guillermo Hernandez Espinoza  on 

In which category the duct used for the HVAC duct's insulation falls into?. Thanks

1
Wed Jun 5, 2013, 12:09 pm

Pilot Credit 10

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Alicia Villanueva  on 

Hallo, My team and I have reduced water use in a project through high-efficient flush fixtures by 67%. In addition, 100% of the water used for sewage conveyance is treated on-site to tertiary stand

0

Calculating FTE- LEED for Healthcare

NC-2009 PIf3:Occupant and Usage Data
posted by  Catherine Blakemore  on 

My project is a surgical suit additions. We are calculating patients as: 1) transients 2) outpatients The only transients for the project are the patients.

1
Tue Apr 30, 2013, 8:13 pm

Multipurpose Space in Basement Regularly Occupied?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Nelina Loiselle  on 

Thank you Todd for answering my previous question- Now I have another one.

1
Fri Apr 26, 2013, 7:47 pm