Forum quick links
MRc2
posted by Pamela Lippe on
When I went in to make my comments the other day, I got kicked out before I could finish and since it is impossible to go back and edit on the USGBC website, I will complete my comments here. Plea
MRc3
posted by Pamela Lippe on
Under Option 1, It is not clear where the information that is being requested exists.
MRc4
posted by Pamela Lippe on
Why not use the word disclosure again or transparency rather than reporting in the title?
Treated water for landscaping
EBOM-2009 WEc3:Water Efficient Landscapingposted by Manasi Kulkarni on
Our project has installed water meters for Irrigation just recently at the start of performance period. The project uses 100% of treated water for Irrigation which is metered.
why the distance between the
NC-2009 SSc1:Site Selectionposted by sujata shakya on
why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......
Infrequent Transient Loads
NC-2009 PIf3:Occupant and Usage Dataposted by Allison Zuchman on
I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.
SRI of White Stone Ballast
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Tate Walker on
I am working on a project that has roughly 50% of the roof surface covered in white colored (not white coated) stone ballast and 50% white PVC.
VRP calculation using design occupancy value
CI-2009 IEQp1:Minimum IAQ Performanceposted by Cassini Kit on
I have a question about the occupancy value of VRP calculation.
Urinal pre-wash and fuzzy control
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Noriko Nagazumi on
Hi all, How would you set the water use for urinals that: 1. Have a 2 liter pre-wash that may be used or turned off 2.
typical floor v/s whole building simulation
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. we need to submit the modelling results for precertification.