Forum quick links
Pilot Credit Alignment with others
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Kelsey Wotila on
This credit aligned with our project’s goals to provide an energy efficient building.
MRp2/c5 -- Can we count shipping dunnage returned to precast manufacturer as material reuse?
NC-v4 MRp2:Construction and demolition waste management planningposted by Terry Thornsbury on
We have a large (800,000sf) project that is being constructed primarily using precast floor decks and architectural wall panels.
Can consider sports club as public assembly to select baseline system
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amal Venugopal on
Hi All,
v4.1 Timing of VOC testing
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Timo Rintala on
The v4.1 standard VOC & particulate testing requires, that the testing is made "after the construction has ended and before occupancy".
On site VOC measurements
NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by Przemysław Rejczak on
Dear Everyone,
I`ve a question regarding to IAQ VOC measurements.
CLASS 1 AIR SEPERATION DISTANCES_62.1 2010
NC-v4 EQp1:Minimum indoor air quality performanceposted by Fotis Kotsopoulos on
In case of a central AHU mounted on roof level supplying 100% (incl. run around coil) fresh air to office spaces:
Monitoring based Cx independent of Advanced Energy Metering?
NC-v4 EAc1:Enhanced commissioningposted by Joyce Kelly on
Our project is pursuing MBCx but the budget cannot support achievement of all rqmts of Advanced Energy Metering. Can we achieve one without the other?