Forum quick links
ASHRAE 90.1, table 6.8.1 and projects outside of USA
NC-2009 EAp2:Minimum Energy Performanceposted by Richard Land on
Hello, I have been asked to help a manufacturer who wants to provide equipment for a LEED project in Europe. It is an airhandling units with packaged heat pump.
time delay for review
posted by Tatjana Ernst on
Hello Everyone, we have a project under review now. The result was expected to be there at 17 Mai 2012! But now is it still open.
UCSC Master Site
posted by James Sherman on
Hi, my name is Nathan Retzlaff and I am interning with James Sherman at UC Santa Cruz where we are in the process of registering UCSC as a master site.
Public transportation access - SSc4.1
posted by Emil Andersson on
Hi. My LEED-HC project is placed on a campus where it will be physically connected to the existing hospital.
List of Approved non-default leakage rate
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Yoyo Shek on
I think most of the projects have encouraged similar project when dealing with the leakage rate (2% by default).
How to calculate 50% in a hotel
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Robert Robison on
Am I allowed to include the thermostats in each guest room when I calculate the 50% of building occupants who have access to individual comfort controls? Also - how do I search the forum?
Window Film
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by AshLee Eustace on
Has anyone submitted for this credit using window film for a glare reduction technique?
Mandatory Re-Certification - Really?
posted by Russell Perry on
I have heard from several people that the recent USGBC Webinar included that startling statement that projects certified under LEED would be required to undertake re-certification on some unspecifi
Appendix G, ASHRAE-90.1-2007
NC-2009 EAc1:Optimize Energy Performanceposted by Divjot Singh on
For HVAC System in Baseline case of modelling, it says: "Operate fan contiuously when spaces are occupied and cycle it during unoccupied hours".