Forum quick links
FTE for disaster recovery site
posted by Luis Huertas on
I am working on a project that includes regular occupants and occupants that will only be there in a disaster situation.
MRc4 Exemplary Performance Threshold
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by matthew strong on
Can anyone tell me where the 50 pg/l-h threshold for exemplary performance came from?
PV Array Energy model calc.
NC-2009 EAc2:On-Site Renewable Energyposted by Ken Scalf on
Hi, I'm working on a project where the owner has interest in adding a roof mounted PV system that is connected to the facility and the grid in the LEED project/boundary and in the associated constr
Alternative compliance
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Angela Saggin on
Hi! We're working to certificate a multifamiliar building in Brazil and we're having a lot of trouble in finding someone to run the blower door test for us.
Enhanced Commissioning for a VRF small system
NC-2009 EAc3:Enhanced Commissioningposted by J.R. Anderson on
When uploading the detail information collected for the enhanced commissioning the details the LEED reference material referenced in the 2009 fundamentals section (step 9) spells out items that are
NPDc3 Diverse uses question
posted by Al Wei on
The concept of diverse uses appear in two places in the rating system: SSLp1 and NPDc3.
Existing Building Reuse--all bldgs or only those you renovate?
posted by Nadav Malin on
Hi folks,
Emergency Egress Doors and Utility Space Doors
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Sara Heppe on
Can a smoking area can be located next to an "emergency/fire egress only" door? Also can a smoking area it can be located within 25 feet of a door that only services a utility space?
Energy Star Portafolio Manager Tool score
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by LEED Pro Consultant on
I'm working on a existing office building that is intended to pursue LEED EB:OM certification.