Topic | Recent |
---|---|
LEED v5: O+M- Public CommentsLEED v5 O&M Existing Buildings Public Commentsposted by Kelly Mehring on May 17, 2024, 4:08 pm
Credit: Operational Planning and Response for Resilience The credit states to '... |
|
Optimized Building ProductsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 6:54 am
50 products for projects outside US is unreal, a lot more effort and less points in this credit |
|
Resilient Site Design / Enhanced Resilient Site DesignLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Chantal Carius on May 18, 2024, 6:59 am
The prerequisite seems challenging to get and think it should adress other environmental prioirty issues depending on the region. Credit is great as the team project can decide... |
|
Protect and Restore Biodiverse HabitatLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Chantal Carius on May 18, 2024, 7:04 am
I think to have 15 native or adapted species as a baseline is a great asset. Also think that the credit should specify the importance of not to importing soil from forests or nature, but... |
|
Planning Zero Waste OperationsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:07 am
It seems that maybe an education scope in this prerequisite is needed to achive the Zero Waste and threshold also seems to be needed as the prerequisite only speaks of "attempting" zero waste... |
|
Assess Embodied Carbon/ Reduce embodied carbonLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:09 am
Not sure where the reference Table of the prerequisite comes from. For the... |
|
Optimize building product BD+C and CSLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:11 am
|
|
Construction and Demolition Waste ReductionLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Chantal Carius on May 18, 2024, 7:14 am
This credit should be attempting zero waste management in construction. Seems to me that this credit is less demanding than the prerequisite of Planning for Zero Waste Operations and shouldn't be... |
|
Minimized Site DisturbanceLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Chantal Carius on May 18, 2024, 7:21 am
This prerequisite is a great goal to achieve. |
|
The Thermal Environment Credit Category Needs AttentionLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Chris Mackey on May 18, 2024, 3:45 pm
I’m glad to see that the new standard includes a reference to a specific known problem of thermal comfort (overcooling) and the ASHRAE-55 section on it but I am overall very disappointed that... |