Forum quick links
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? Thanks!
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!
All open space that is counted toward this credit will be preser
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Agnieszka Rylska on
As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building".
access to medical point and massage point
NC-2009 IDc1:Innovation in Designposted by Agnieszka Rylska on
We are considering options for innovation credits.
Compliance for Corporate Interiors?
Pilot-Credits EQpc78:Design for active occupantsposted by Rachel Bannon-Godfrey on
Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.
Leed Footprint exceeds leed Boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Jorge Lopez de Obeso on
Hi, I'm having some problems with a project.
Option 3 tracking
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Tommy Linstroth on
It doesn't appear USGBC has updated their tracking tool/materials calculator to account for Option 3 yet, or have you seen an updated resource?
Audio System
Retail-CI-v2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Nativa Architecture on
May we take out the Bose Audio System from the "Equipment and Appliances" calculation? It will be installed above the metal celling with the light system.
revolving doors and side entrances
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Agnieszka Rylska on
I am working on a project (shopping mall) that will have revolving door as the mail entrance and it will be equipped with a permanent walk-off system.
n/a
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Anastasia Makarenko on
Does anyone know whether the waterproofing sealer used under the raised flooring to protect concrete slab needs to comply with VOC requirements? Thank you in advance.