Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Credit Still Open?

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Rachel Bannon-Godfrey  on 

Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? Thanks!

0

Credit Still Open?

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Rachel Bannon-Godfrey  on 

Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!

1
Thu Jun 9, 2016, 3:30 pm

All open space that is counted toward this credit will be preser

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Agnieszka Rylska  on 

As part of this credit the Investor has to confirm that "All open space that is counted toward this credit will be preserved for the life of the building".

1
Tue Jan 17, 2017, 10:48 pm

access to medical point and massage point

NC-2009 IDc1:Innovation in Design
posted by  Agnieszka Rylska  on 

We are considering options for innovation credits.

0

Compliance for Corporate Interiors?

Pilot-Credits EQpc78:Design for active occupants
posted by  Rachel Bannon-Godfrey  on 

Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.

1
Thu Jun 9, 2016, 3:09 pm
1
Tue Jan 17, 2017, 10:17 pm

Option 3 tracking

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Tommy Linstroth  on 

It doesn't appear USGBC has updated their tracking tool/materials calculator to account for Option 3 yet, or have you seen an updated resource?

1
Thu Jun 9, 2016, 6:34 pm

Audio System

Retail-CI-v2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Nativa Architecture  on 

May we take out the Bose Audio System from the "Equipment and Appliances" calculation? It will be installed above the metal celling with the light system.

1
Sat Aug 26, 2017, 11:44 pm

revolving doors and side entrances

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

I am working on a project (shopping mall) that will have revolving door as the mail entrance and it will be equipped with a permanent walk-off system.

1
Sat Jun 18, 2016, 1:59 pm

n/a

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Anastasia Makarenko  on 

Does anyone know whether the waterproofing sealer used under the raised flooring to protect concrete slab needs to comply with VOC requirements? Thank you in advance.

1
Sat Jul 2, 2016, 4:37 pm