Forum quick links
Fan cycling in System 1/2
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I have a question about fan cycling for system 1 in residential units. G3.1.2.4 says fan should be on whenever space is occupied. Does this applies to residential units?
Students K-12
posted by Erin Holdenried on
For a K-12 school where each student will be there most of the day. Would the students be counted as FTE?
Can a Retail CI Project achieve Water Cr if it has no Rest rooms
Retail-CI-v2009 WEc1:Water use reductionposted by Aswin M on
Can a Retail CI 2009 (restaurant) project achieve Water use reduction credit, if there is no Rest room in the (Retail CI) project scope.
refrigeration units
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Mehdi Kardehi on
Hi, In our project there are couple of cool rooms/freezers using reciprocating compressors. Shall we list it as reciprocating compressor or we need to select other and type in refrigeration units
Overnight apartments
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Sara Johansson on
Hi! My Project has space types office, apartments (with residents) and overnight apartments (rented by the office tenant for office guests).
Walking path question
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Chris Miller on
Can our walking path that leads to the bus stops go through the buildings parking lot?
Thinner
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Gustavo De las Heras Izquierdo on
Is there any VOC requirement for thinners?
New Construction vs. Major Renovation
posted by Curtis Clark on
I have a project which totally removes the building envelope, lighting/electrical system, and mechanical/plumbing system. Only the structure remains.
BPDO Calculator Error
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michael Wahjudi on
Hi all, anybody having issue with the BPDO calculator? Since we have used for our projects and the data are misplaced under different sheets.
Correct spelling for Miranda
posted by Andres Schwarz on
The correct spelling for the new LEED Fellow from Edificio Verde SA is Renato Miranda (full name: Renato Miranda Ibañez: http://www.edificioverde.com/index.php?sec=equipo). Mr.