Forum quick links
View Lines in Plan
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Maggie Hogan Skaug on
What angle are view lines drawn in plan?
Seasonal Public Transit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Justin Schwartzhoff on
Our project is on a campus within a college town. During the time when students are active on campus (Fall through Spring), several bus lines operate within a 1/4mile of the site.
Blue Angel and LGA accredited for Greenguard & Cradle to Cradle?
posted by Sandra Iozzelli on
We are a distributor in Peru for a German producer of seating furniture and we are applying for Leed's credits in the following categories: New Construction(NC), Retail(RE), Schools(SC), Commerci
Showerheads and bath
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Daniel Vila on
We have a hotel where some rooms have both, showerheads and baths. One showerhead placed overhead in the bathroom, and the bath placed in the middle of the room. They have different flow-data.
EAp2 "USGBC approved equivalent"
NC-2009 EAp2:Minimum Energy Performanceposted by Susannah Goddard on
I am working on a project in the UK and the client wants to know what the alternatives are to ASHRAE 90.1 for energy modelling to demonstrate compliance with EAp2 and EAc1.
Vairable flow showers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Nicholas Bristow on
We are considering using multi-flow shower heads on a commercial office project for the locker rooms.
LEED NC vs LEED HC
posted by Kerrie Racicot on
Hi there, We are working on project (an Ambulatory Care Center) that is primarily out-patient, however the ER is 24 hours and the Pharmacy is 24 hours.
Demolished Building - Material Reuse
NC-2009 MRc3:Materials Reuseposted by Lauren Bellamy on
Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.
Time after Performance Period- EBOM 2009
posted by Ana Carolina Montecinos Ongini on
I am a little confuse about how many days we have to submit the project after performance period ends. Is it 60 or 90 days? Thanks in advance
IEQc8.1 Core and Shell credit with no tenant fit out
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shelly Christman on
We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.