Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Ergonomic Credit

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Katie Cervenec  on 

Does anyone have any tips for getting the building occupants excited about participating in the ergonomic credit and learning about their new ergonomic features in their building?

1
Wed Dec 30, 2015, 10:45 pm

Existing building

NC-2009 MRc7:Certified Wood
posted by  Charalampos Giannikopoulos  on 

When reusing an existing building (major renovation) then only any new wood materials would be applicable for the credit?

1
Tue Mar 31, 2015, 3:37 pm

renovation and addition: effect on site boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Ramana Koti  on 

Dear all, We're working on a project that renovates a tiny portion (interior fit out only) of an existing building and involves an addition right next to the renovated portion.

0

Mechanic Area Washfountatin

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Robin Dukelow  on 

We have a NC-2009 project were there is an automotive service area that has a washfountain for use by the mechanics only.

1
Thu Apr 16, 2015, 8:41 pm

Previously Developed or Not

CS-2009 SSc1:Site Selection
posted by  Kristopher Lashley  on 

Our current project is located on a plot of land that 3/4 of it was developed into commercial retail.

1
Wed Apr 1, 2015, 2:31 am

n/a

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Stella Stella  on 

Hi, We have a project with some areas served by AHUs and some areas served by contant volume FCUs.

1
Wed Apr 1, 2015, 2:05 pm
1
Wed Apr 1, 2015, 5:19 pm

Using EQc4.5 as an ID credit.

Schools-2009 IEQc4.5:Low-Emitting Materials—Furniture and Furnishings
posted by  TODD REED  on 

If a LEED for Schools project earns EQc4.1, 4.2,4.3, and 4.4; can they then use IDc 4.5 as an ID credit?

0

Minimum Energy Performance Calculator - Receptacle Equipment

NC-v4 EAp2:Minimum energy performance
posted by  Mark Zoeteman  on 

Minimum Energy Performance Calculator on process loads tab under receptacle equipment modeling methods paragraph indicates there are three options to model receptacle equipment: average equipment p

1
Wed Apr 1, 2015, 11:40 pm

ASHRAE 90 2007 item 9.4.4

NC-2009 EAp2:Minimum Energy Performance
posted by  Iqbal Khalilullah  on 

Hi Marcus, Please advise me regarding ASHRAE 90.2007 mandatory provision item 9.4.4 which is written as follows: "All exterior building grounds luminaires that operate at greater than 100 W shall

1
Mon Apr 6, 2015, 3:34 pm