Forum quick links
ITE for elementary school with half day students
Schools-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by April Brown on
In the ITE study calcs, does it make sense to only count the number of students in the building at one time.
Using EBOM credit as an ID credit for NC 2009 submittal
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Jessica Tyler on
I would like to use this credit as an Innovation and Design credit for a New Construction (NC 2009) submittal.
LEED Site Boundary - Campus - easement for utilities
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michele Helou on
'The LEED project boundary must include .......all land that was or will be disturbed for the purpose of undertaking the LEED project.' What if a small section an adjacent campus parking lot that
200 yards from entrance
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Gianluca Padula on
Walking distance or crow flies?
BTU Metering for Existing HVAC
CI-2009 EAc3:Measurement and Verificationposted by Jareb Ketay on
I have a tenant renovation project occupying 1 story of an existing 10 story building (
Who Can Be the Commissioning Authority
NC-2009 EAc3:Enhanced Commissioningposted by Robin Dukelow on
Hello, I am trying to locate the full document but only have been able to find the Table that was published. Does anyone know where I can find this information? - Thank you!
Alternative path - maximum achievable points
NC-2009 WEc3:Water Use Reductionposted by Gloria Duci on
Hello everyone! In order to reduce use of potable water, WCs will be served by rainwater collected on-site.
LEED v4 Quick Reference - faults
posted by Maria Glädt on
If you read the Quick Reference under Getting Started in the LEED v4 there are some mistakes both regarding available points under credits and also which prereq that is required or n/a.
Baseline Ventilation
CS-2009 EAp2:Minimum Energy Performanceposted by Toni Herena Montull on
Dear all, our previous version of the baseline model in a C&S building had the same ventilation rates than the proposed.
Interconnecting Staircase
Pilot-Credits EQpc78:Design for active occupantsposted by Michelle DiPenti on
I have a question about optional requirement #3, "Provide accessibility to at least one open or interconnecting staircase to at least 50% of the tenant/occupant floors for convenient pedestrian ver