NC-2009 MRc7:Certified Woodposted by Teresa Bell on
If a custom FSC desk is made for a project, the total value of the desk (including the non-wood items such as drawer and door hardware, plastic grommets, and a glass top) would be t
Vestibules for retail shops less 300 m2 - NR
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
I'd like to use 5.4.3.4 Exception g to exclude the need for vestibules for each shop entrance of the shops that our office building has on the street level.
entry way compliance for shops at street level of office block
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Jean Marais on
We have small shops (less than 100m2) on the street level of our office building. Each shop has an entrance to the pedestrian. How can one comply to the 10ft entry way system?
Required Exhaust Rates - spaces with hazardous gases
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Jean Marais on
Why does the requirement of 0.5 cfm/sf exist when IEQp1 requires 0.5 cfm/sf as the minimum exhaust rate from such spaces (ASHRAE 62.1-2007 Table 6-4)? If you don't have at least 0.5 cfm/sf, you do
Minimum equipment efficiencies ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
Can anyone please clarify if packaged air-to-water heat pumps (chilled and/or hot water production) have to: 1) comply with minimum efficiency requirements set to for water chilling packages in coo
Energy Savings - Solar Water Heating
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi! when i have a solar water heating system, must submit like energy savings? Thanks
PVC free wallcoverings and shower curtains
EBOM-v4 MRp2:Facility maintenance and renovations policyposted by joel longstreth on
Joining the party late. Trying to figure out if, how and where our not PVC for wallcoverings and shower curtains fits into LEED.
Number of recycling rooms in one building
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Guillermo Alonzo on
Hello, If a building has two basements, and the project requires a 225 SF recycling room, is it possible to divide the recycling room in two ? i.e.
ASHRAE STANDARDS 90.1 Appendix G - Humidity Controls
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
Appendix G does not address humidity controls.
Leed Online Forms
NC-2009 MRc2:Construction Waste Managementposted by kelly saunders on
I'm not clear about using the LEED online forms. Are they supposed to filled in periodically and uploaded into the system or is this done at the end of the project when submitting for credits?