Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

FSC products that include non-wood components

NC-2009 MRc7:Certified Wood
posted by  Teresa Bell  on 

If a custom FSC desk is made for a project, the total value of the desk (including the non-wood items such as drawer and door hardware, plastic grommets, and a glass top) would be t

1
Fri Nov 1, 2013, 3:12 pm

Vestibules for retail shops less 300 m2 - NR

NC-2009 EAp2:Minimum Energy Performance
posted by  Jean Marais  on 

I'd like to use 5.4.3.4 Exception g to exclude the need for vestibules for each shop entrance of the shops that our office building has on the street level.

1
Thu Oct 17, 2013, 2:34 pm

entry way compliance for shops at street level of office block

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Jean Marais  on 

We have small shops (less than 100m2) on the street level of our office building. Each shop has an entrance to the pedestrian. How can one comply to the 10ft entry way system?

1
Thu Oct 17, 2013, 12:40 pm

Required Exhaust Rates - spaces with hazardous gases

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Jean Marais  on 

Why does the requirement of 0.5 cfm/sf exist when IEQp1 requires 0.5 cfm/sf as the minimum exhaust rate from such spaces (ASHRAE 62.1-2007 Table 6-4)? If you don't have at least 0.5 cfm/sf, you do

1
Sun Nov 3, 2013, 1:51 pm

Minimum equipment efficiencies ASHRAE 90.1

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

Can anyone please clarify if packaged air-to-water heat pumps (chilled and/or hot water production) have to: 1) comply with minimum efficiency requirements set to for water chilling packages in coo

1
Thu Oct 17, 2013, 2:45 pm

Energy Savings - Solar Water Heating

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi! when i have a solar water heating system, must submit like energy savings? Thanks

1
Thu Oct 17, 2013, 6:17 pm

PVC free wallcoverings and shower curtains

EBOM-v4 MRp2:Facility maintenance and renovations policy
posted by  joel longstreth  on 

Joining the party late. Trying to figure out if, how and where our not PVC for wallcoverings and shower curtains fits into LEED.

1
Fri Oct 18, 2013, 5:58 pm

Number of recycling rooms in one building

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Guillermo Alonzo  on 

Hello, If a building has two basements, and the project requires a 225 SF recycling room, is it possible to divide the recycling room in two ? i.e.

1
Fri Oct 25, 2013, 4:23 pm

ASHRAE STANDARDS 90.1 Appendix G - Humidity Controls

NC-2009 EAp2:Minimum Energy Performance
posted by  Curtis Clark  on 

Appendix G does not address humidity controls.

1
Fri Oct 18, 2013, 8:47 pm

Leed Online Forms

NC-2009 MRc2:Construction Waste Management
posted by  kelly saunders  on 

I'm not clear about using the LEED online forms. Are they supposed to filled in periodically and uploaded into the system or is this done at the end of the project when submitting for credits?

1
Fri Oct 18, 2013, 8:24 pm