Forum quick links
Energy Star Appliances
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Can savings be reflected on the energy model due to use of energy star appliances?
Systems Narrative
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Kendrick Stalnaker on
For the systems narrative I have the rooftop unit operations broken down as well as the variable air volume boxes.
WOC Diplomat Series Walk Off Carpet
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Erin Nuckols on
Hello, We are planning to use the WOC Diplomat Series walk-off carpet. The product specs indicate that it meets the criteria for IEQc5 because the installation is semi-permanent.
Multiple or Single Zone?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Esteban Martinez on
Hello everybody We are working on a CI 2009 Office project with dedicated Fan Coil Units for each space. The FCU are located above the ceiling (inside the plenum).
Multiple or Single Zone?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Esteban Martinez on
Hello everybody We are working on a CI 2009 Office project with dedicated Fan Coil Units for each space. The FCU are located above the ceiling (inside the plenum).
Scheduling of Building Flush out for LEED Core and Shell Project
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Sangmin An on
Hello, I have a few questions in connection with SCHEDULING of IAQ Management Plan.
Same certification process with separated HVAC systems
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt on how to model the baseline HVAC system of a specific project, which consists of a 4-floor base building from which rise two tower with independent HVAC systems.
IEQc5 - MERV 13 Filtration
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Patrick Nall on
Does anyone know if the requirements of this credit can be met with a split-system for an exercise room if the outdoor air ONLY has the MERV 13 filtration? There is no return air on the unit.
CS with penthouse appartments
CS-2009 IEQp1:Minimum IAQ Performanceposted by charles bell on
We have a CS with five floors of tennant spaces (mechanical vent) and five appartment on the top floor that have operable windows for vent. Can we have each one of the appartments as zones?
Site Disturbance vs. LEED Boundary
NC-2009 MPR7:Must comply with a minimum building area to site area ratioposted by SmithGroup BG+LU FW on
I am working on design documents for a 22 acre urban site that will be developed into a public park.