Instantenous electric water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Rustige on
Hello, The model I'm working on has instant electric water heaters, per 90.1 7.4.2 Equipment Efficiency, "Equipment not listed in Table 7.8 has no minimum performance requirements." Electr
Option #3 is added to EAc5 M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
I would like to find out what are the requirements for achieving EAc5 - Option #3? Where can I find information to read on MPR #6? and What is :" Option 1 in Pl Form1? Thank you very much
Fresh air from different AHUs for the same room
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Shadi Sobh on
hi all, An existing case were the floor is feed by two (2) variable AHU’s, and a specific room is supplied via two (2) VAVs and each VAV is connected to a different AHU; while calculating the fre
Comprehensive waste reduction program
NC-2009 IDc1:Innovation in Designposted by Magda Aghababyan on
If a manufacturing plant decides to do a comprehensive waste stream audit for its entire manufacturing process and implement a waste reduction plan will it be considered as an innovation credit? T
Stormwater to public rainwater channel that is connected to sea
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Lise Dannesboe on
Our building is connected to a public rainwater channel which is placed out of the LEED boundary, the rainwater channel is connected to the sea.
Defining "Footprint" when the Building is on a slope
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Amit Ahiel on
Our project is on a sloped site so the main entry (we call it "ground floor") in above another entry point where part of the building is embedded in the earth.
Warehouse -
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Devani PERERA on
Hi, I am working on a warehouse project.
Projects outside US
posted by FRAGKISKOS LEVANTIS on
What is the official reference guide for countries outside US for New Construction and Major Renovations (LEED 2009).
MPR #6 modification
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Ron Dean on
Hello, I've seen in leedonline for a recently registered project I'm working on that this form (PIf1) has been updated from version 4.0 to 5.0.
Measurements
Pilot-Credits EQpc24:Acousticsposted by Anulak Siwabut on
I don't see specified in the documentation the extent of measurements required in order to meet this credit.