Infrequent Transient Loads

NC-2009 PIf3:Occupant and Usage Data
posted by  Allison Zuchman  on 

I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.

1
Wed Apr 24, 2013, 6:08 pm

SRI of White Stone Ballast

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Tate Walker  on 

I am working on a project that has roughly 50% of the roof surface covered in white colored (not white coated) stone ballast and 50% white PVC.

1
Tue Apr 2, 2013, 2:16 pm

VRP calculation using design occupancy value

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Cassini Kit  on 

I have a question about the occupancy value of VRP calculation.

1
Tue Apr 2, 2013, 4:08 pm

Urinal pre-wash and fuzzy control

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Noriko Nagazumi  on 

Hi all, How would you set the water use for urinals that: 1. Have a 2 liter pre-wash that may be used or turned off 2.

0

typical floor v/s whole building simulation

CS-2009 EAp2:Minimum Energy Performance
posted by  shashank jain  on 

Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. we need to submit the modelling results for precertification.

1
Tue Apr 2, 2013, 1:12 pm

Upper limit?

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  American University  on 

I'm wondering if all identified ECMs have to be included in a longer term capital improvement plan OR if the audit revealed a project with, say, a 12 year pay back period and high implementation co

1
Tue Apr 2, 2013, 2:02 pm

CONCRETE MIX REPORTING

CI-2009 MRc5:Regional Materials
posted by  Shane Tohara  on 

We are using 2 seperate concrete mixes on our CI project. A letter from the manufacture details the raw materials and ratios for each mix. Each type of mix is clearly identified on the invoice.

1
Tue Apr 2, 2013, 3:08 pm

Pilot House - Credit 67 Approach

Pilot-Credits EApc67:Energy Jumpstart
posted by  Ryan Pitera  on 

We are using this credit for our certification process after not meeting the minimum Energy Star requirements and it seems to be working out great.

0

SSc4.2 in Multiple Buildings

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Robert Phinney  on 

At a new corporate campus, we are trying to apply the credit for C&S via the multiple buildings options.

1
Mon Nov 4, 2013, 6:21 pm

Bicycle racks and chaging rooms underground

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Michael E. Edmonds-Bauer  on 

Our project is providing the bicycle racks and the showers separately in thre differente levels. A set of 6 bicycle racks are on the underground level 1 A set of 28 bicycle racks and 4 showers are

1
Mon Nov 4, 2013, 6:17 pm