Forum quick links
Entrance door opening blocking mat
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Dina Al-Nakib on
We are installing mats at all the building's entrances.
LEED CS vs. LEED CI
CI-2009 MRc4:Recycled Contentposted by Mathilda Jonsson on
Hi all I'm working on a LEED CS project and a LEED CI project wich will be located in the LEED CS project.
Project Site Boundary Includes Existing Building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Oxley on
Our project site includes the LEED project (new building) and a separate (not connected) existing building that will remain.
Paving as part of Construction Costs
NC-2009 MRc4:Recycled Contentposted by Mariah Grife on
The new LEED language has clarified that 32.10.00 Paving should be included in the construction costs. However, the only paving that will occur on my project's contract will be in-street paving p
P1 form 4: Date team expects to make first LEED submittal
NC-2009 PIf4:Schedule and Overview Documentsposted by John Eden on
If we are doing split review should this date be for the Design Review?
Only LEED CS inside proj. boundary
ND-v2009 GIBc1:Certified green buildingsposted by Karyn Rodrigues on
Considering that we have 6 LEED CS-certified buildings inside project boundary.
combine rail and bus for exemplary performance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Courtney Royal on
hi, i was wondering if its possible to use a combination of subway and bus lines to achieve an ID EP credit. I think we've done that in the past, but I can't remember! Thanks!
Wind Energy
CS-2009 EAc6:Green Powerposted by LEED Pro Consultant on
Hi, We are working on a project in Mexico. In order to comply with the credit requirments its valid to purchase electricity directly from a wind farm also in Mexico to get the points?
Served by part of large air-conditioning system
CI-2009 IEQp1:Minimum IAQ Performanceposted by Shirong Meng on
If the project spaces are served by a large VAV system which has mixing of central Outside air inlet and recirculation air, but the VAV system is also serving other tenant spaces.
90.1 Envelope Requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Ruben Porter on
I'm trying to model a wood framed 4 story multifamily building, and the client wants to go without continuous insulation which is what's called for on table 5.5-4, resulting in a higher U value th