Pilot-Credits WEpc18:Appliance and process water use reductionposted by Alexa Stone on
Hi All, This may be a dumb question but it doesn't seem clear in the credit language. Is ACTUAL purchasing of this equipment required during the performance period like the other MR Credits?
polyurethane foam
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Adriana Hansen on
I'm having trouble classifying the product polyurethane foam. I understand that this product is an aerosol adhesive, but I not sure. Still on the same subject, about the ieq c4.1 template in versio
External lighting - Addenda 100001062 -Addendum I to ANSI/ASHRAE
NC-2009 EAp2:Minimum Energy Performanceposted by Adrienn Gelesz on
Hi! There has been an addenda incorporated in the reference guide to SSc8. According to this Individual Lighting Power Allowances for Building Exteriors is now zone dependent.
flush-out documentation
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Alicja Bieszyńska on
Do we have to document flush-out somehow for the credit compliance? Is any report or declaration needed?
Concrete pre or post consumer
NC-2009 MRc4:Recycled Contentposted by Albert Sagrera on
I would like to know how you can consider a concrete which has returned to the production plant without being used in the construction. Can be a residue pre or post consumer? Thanks.
Magnetic bearing Chillers
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
Hello all. Does anyone have experience with justifying that the lower full load efficiency of magnetic bearing chillers is ok due to their exceptionally high IPLV? ASHRAE 90.1-2007 and ARI 550/59
Should parking counts include handicap stalls?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Tracy Baker on
Parking counts for the school project I am working on include handicap stalls. It appears that based on comments I have received based on the review that handicap stalls are not allowed?
Submiting a new credit during a clarification
posted by Christopher Sawyer on
I did a split review under V2.2 and I'm now in Construciton submittal but the reviewers have asked for clarifications.
Template (v3) question
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Todd Bundren on
Does anyone know how to erase a line item from the tables without deleting all of the entries below?
Previously constructed Core and Shell building
posted by Bryan Waters on
Our client constructed a 10 story healthcare building about a couple of years ago. Only the core and shell was constructed at that time. No interior build-out was part of the construction then.