Forum quick links
Dorm Rooms
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by American University on
We're pursuing EB:O&M on several campus buildings including residence halls, classroom buildings, and office buildings.
Air-tight Drywall Approach/Compartmentalization &Sprinkler Heads
posted by Kathy Kahill on
What are people doing out there for sealing quick-response sprinkler heads in mid-rise projects? I've been told that the gasket approach cannot be used with quick-response heads.
ID Credit for New Construction Projects
EBOM-2009 WEc1:Water Performance Measurementposted by Heather Holdridge on
Has anyone had any success using this as an ID credit for a new construction project?
Path 6
CI-2009 SSc1:Site Selectionposted by Nelina Loiselle on
Does anyone have a sample of a sequence of operations narrative? I am not sure what they'd like to see.
Entryways system disntance 10ft
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by gabriel Morales on
Hello, architecture according to our main lobby, meeting with the distance of 10ft mat we complicated for users coming from the parking lots. The design team has proposed installing a section of
Interpretations Database
posted by Marcus Sheffer on
I was scanning a comment I made last year after the new database was released and wanted to offer some praise to the the current version.
Performance Requirements for Water Heating Equipment
NC-2009 EAp2:Minimum Energy Performanceposted by Oliver Lange on
Hello, our project has 40 electrical table top water heaters. The electrical input is 2 kW and 5 liter storage. What is the right way for modeling the baseline builing water heating equipment?
Soil remediation
NC-2009 SSc3:Brownfield Redevelopmentposted by Mark Meaders on
The definition of remediation as it relates to this credit is the process of cleaning up a contaminated site by physical, chemical, or biological means.
Planters
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gabriela Hernández Castillo on
We need to apply for the option 2 in our project since the 20% of the total site area is greater than the 50% of the site excluding the building footprint. According to the 20% requirement, we nee
LEED Online Issues
posted by Kalavati Mahajan on
Hello, I read all the treads below and also followed the system requirement guidelines at LEED online.com.