Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Calculating VLT- Glazing Only or Full Assembly

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Greengrade User  on 

Does anyone know if the VLT factor inserted into the day lighting prescriptive path spreadsheet is for the glazing only, or is it supposed to factor in the mullions/screens?

1
Mon Apr 9, 2012, 7:12 pm

Existing Building for LEED on Campus - EBOM Path

EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof
posted by  David Tetro  on 

I am working on a building for LEED Certification - it is one of several buildings on campus (the others are not going for LEED status at this time).

1
Tue Apr 10, 2012, 11:16 am

Offsite showers FTE, please help

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Sara Neff  on 

Our project has bike racks and showers in an adjacent facility.

1
Tue Apr 10, 2012, 1:59 pm

Motors that should be covered by 90.1 efficiency requirement

LEED for Healthcare forum
posted by  James Chueh  on 

Hi Are the motors in the system below need to comply with 90.1 min efficiency requirement? 1.

0

Jasmin,

General forums
posted by  Emily Catacchio  on 

If the first building is entirely complete and is already certified under New Construction, then you will keep the certification even though there is further work happening which is outside of the

0

Documentation of Roof - In General

EBOM-2009 SSc7.2:Heat Island Reduction—Roof
posted by  David Tetro  on 

Hi all - just a question as I am new to this... I am looking to get certification for an existing building (EBOM) and I have all the drawings in CAD - however, under normal circumstances, there are

1
Tue Apr 10, 2012, 7:49 pm

LPD category for double height entrance hall

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Felipe Duran  on 

We have a residential project - with a double height entrance lobby (main entrance to the bldg) - and I am not sure how to calculate the LPD for this space - should I treat it as: 1) Lobby (14W/m2

1
Wed Apr 11, 2012, 1:32 am

LEED Boundary

General forums
posted by  Sherri von Wolfe  on 

Good afternoon, We have an unusual campus project in which the majority of the project renovation and new construction is in the basement.

0

acceptability criteria of approximate HVAC models

CS-2009 EAp2:Minimum Energy Performance
posted by  Rosana Correa  on 

Dear All, I am modeling an existing building with a Water-cooled VRF HVAC system.

1
Wed Apr 11, 2012, 1:56 pm

Non-fossil fuel in district heat

NC-2009 EAp2:Minimum Energy Performance
posted by  Jens Apel  on 

This question relates to the thread below (“Absorption chiller in baseline model”) but is of more general nature.

0