Forum quick links
Space Usage Type - Table
posted by Gail Vittori on
Can anyone clarify if the column "Regularly Occupied Area" should correlate with "Regularly Occupied Spaces" as defined in EQc8: Views and Daylighting or should it be all occupy able space?
Retail Space inside a Shopping Center
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Sustentator Argentina on
We are looking to certify a retail space inside a huge shopping center under Commercial Interiors (not as Retail Commercial Interior, the shopping is NOT certified) We are considering that our shop
Achieving C&S certification with no ventilation or FTEs
posted by Tony Schafer on
I'm wondering about LEED certification for a C&S building that will have no ventilation and will have no FTEs upon initial completion.
LEED EB or LEED NC?
posted by Marcio Alberto Casado Pereira on
Is there any percentage limit above which an existing building that is undergoing a renovation is considered a New Construction?
facade lighting savings
CS-2009 EAc1:Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on
Dear Marcus We conducted an energy simulation analysis and included Facade lighting as one of the energy saving features.
Private or Public Restrooms?
CS-2009 WEp1:Water Use Reductionposted by Alejandro Vega on
I'm working in a LEED CS Warehouse:non-refrigerant building, the project is divided in 2 main areas: office and warehouse.
EAp2 Required Signatories
NC-2009 EAp2:Minimum Energy Performanceposted by Bob Korp on
Two project engineers have completed the sign-off task, but a 3rd has been unable to use LEED ON-LINE despite my efforts to provide remote assistance.
Square Footage Discrepancy
Schools-2009 EAp2:Minimum Energy Performanceposted by Michael Kros on
Our mechanical engneer/energy modeler just contacted me to ask about a discrepancy in our square footages from what we have entered on PIf2 on LEED Online, and what he has input in the energy model
MR3 or MR1.2?
CI-2009 MRc3.1:Materials Reuseposted by Kenny Grossman on
I've got a project where nearly nothing has changed between tenants.
Hi Luana
posted by Marcus Sheffer on
In the future try posting under the appropriate LEED prerequisite or credit, you will get more traffic that way. Your comment was tagged under EAp2 so that would be the best place.