Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Medical Equipment: Pilot Credit, LEED Point, Incentive Programs?

Pilot-Credits EApc3:Medical and process equipment efficiency
posted by  Catherine Pana  on 

I work for GE Healthcare and we recently introduced a new CT (Cat-Scan) Scanner to the market that is 60% more electrically efficient.

1
Fri Jan 13, 2012, 6:03 pm

Gender Ratio Impact on WE p1 and c3 Water Calculations

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  J Douglas Dietrich  on 

We understand from experimenting with the forms that the results are influenced by the male to female ratio. Are all projects required to use a 50:50 ratio?

1
Thu Jan 12, 2012, 9:00 pm

Pilot Credit #45

Pilot-Credits SSpc45:Site assessment
posted by  Jill DeMarotta  on 

I think this is a good credit.

0

Synthetic turf roofs?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Nelina Loiselle  on 

Would a "green" roof done with synthetic turf apply to this credit under the green roofing option?

1
Tue Jan 24, 2012, 8:41 pm

Determining Baseline System Type

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Rebekah Burke  on 

I am trying to correctly determine the baseline system for my LEED energy model. I have a 7-story hotel building so it will either be System 1- PTAC or System 2 –PTHP based on ASHRAE 90.1-2007.

1
Fri Jan 13, 2012, 5:38 pm

Performance period - general info

Performance Period
posted by  Andy Plogsted  on 

I have not been able to find out much info on perf periods, so I have a few questions.

1
Fri Feb 17, 2012, 5:17 pm

NC Major Renovation with minimal site disturbance

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Monika Mickute  on 

Dear LEEDUsers, We are working towards certifying our own office building (an existing 50 year old, single story structure of ~7,000 sf on a 0.64 ac lot).

1
Mon Jan 16, 2012, 4:56 pm

WC average flow rate for residential use

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Udana Ratnayake  on 

we are working on a hotel project where the guest rooms are provided with dual flush (4.5L/3L) WCs. no urinals are provided.

1
Wed Jan 25, 2012, 5:00 pm

Home Automation in Multifamily High Rise Residential Project

NC-2009 EAc1:Optimize Energy Performance
posted by  Omer Moltay  on 

Dear All, Would it be possible to claim EAc1 credits for local automation in dwelling units to achieve the following: (1) Automatic shut down of lighting and HVAC units when there is no occupancy

1
Mon Jan 16, 2012, 3:05 pm

Tenant leases, credit for upgrades other than LPD reduction?

CS-2009 EAc1:Optimize Energy Performance
posted by  Dan LeBlanc  on 

Has anyone been successful in claiming savings in tenant spaces for anything other then lighting power reductions? Demand controlled ventilation, daylight sensors or plug load reductions perhaps?

0