Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Documentation of Remediation

Schools-2009 SSp2:Environmental Site Assessment
posted by  Laura Long  on 

We have a site we know to be contaminated and we are undertaking a remediation plan.

1
Sun Nov 20, 2011, 2:15 am

PF Prerequisite: Water Metering

General forums
posted by  RETIRED   on 

I already submitted my comments on this prerequisite to USGBC but just noticed the following that needs to be addressed.

0

LEED AP with Specialty

General forums
posted by  Sara Neff  on 

I am in favor of requiring that LEED APs have a specialty in order to get an additional point in a certification.

0

LEED ND credit

General forums
posted by  Sara Neff  on 

I really disagree that a LEED ND project needs to have achieved Stage 2 certification for a building on the project to get the point.

1
Wed Sep 14, 2011, 7:01 pm

Changes in Daylighting requirements from v2

EBOM-2009 IEQc2.4:Daylight and Views
posted by  bayard fenwick  on 

I am working on a project that was certified under LEED EB v2.

1
Tue Nov 15, 2011, 1:53 pm

Tenant Lease Agreement

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Udana Ratnayake  on 

what are the LEED specific information that should be included in a tenant lease agreement? is it required to include all credits mentioned under case A,B & C of LEED NC rating system?

1
Mon Nov 21, 2011, 4:12 am

Attached Buidlings/LEED Project Boundary

General forums
posted by  Lauren Ford  on 

We have an existing parcel of land with one small existing restaurant on it (not LEED Certified).

1
Mon Nov 14, 2011, 6:28 am

Ingredient Disclosure: Perspectives on Coatings and Sealants

General forums
posted by  Dwayne Fuhlhage  on 

Thanks to Tom Lent for his commentary on the subject of ingredient disclosure. I also note the stated preference to focus first on interior finishes.

0

Landscape lighting

NC-2009 EAc1:Optimize Energy Performance
posted by  Julien Daclin  on 

Appendix G (Table 3.1) states that lighting power for building facades has to be modeled in the energy simulation.

1
Mon Sep 19, 2011, 8:39 pm

DES and required Leakage Rate Calculations

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Brooks Critchfield  on 

I have a project on a looped DES with a couple of non-compliant CFC-chillers upstream/on the same loop. A 3rd-party audit has determined that phase-out is not economically beneficial in 10-years o

1
Tue Nov 22, 2011, 5:09 am