Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Materials - Core & Shell

CS-2009 MRc5:Regional Materials
posted by  Joaquim Lima  on 

Good morning! my project is classified as Core & Shell, I wonder if the calculations for credit 5 (Materials and Resources) should consider only the materials used in the common areas of the

1
Fri May 20, 2011, 4:00 am

WE p1/C3 in Core & Shell

NC-2009 WEc3:Water Use Reduction
posted by  Anu Sumanth  on 

If all the plumbing fixtures are to be installed in future by tenant, and if I check Tenant Neutral for WE p1; I will not be able to achieve the prereq. 20%. Is this typical?

1
Thu May 5, 2011, 4:53 pm

Combined Sewer Areas

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Scott Durbin  on 

In areas with combined sewers, could option 1 be achieved by reducing runoff volume to the sewer?

1
Thu May 5, 2011, 10:14 pm

Tracking compacted trash and loose recyclables

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Kristen Salinas  on 

My project is having problems tracking their trash and recyclables by volume. The trash is compacted 4:1 in a trash compactor.

1
Wed May 25, 2011, 2:00 pm

Water filtration

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Gabriela Hernández Castillo  on 

How much filtration is required when discharging rainwater that contains suspended solids? We have some rainwater acumulation and we would like to know if a simple screening will be enough.

0

80% adoption for CaGBC users

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Emma Sanborn  on 

Note to any CaGBC users: CaGBC doesn't mention a 20% minimum anywhere in SS c2.

0

we p1

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Antonio Pellegrino  on 

This is the first time I am working on a LEED EBO&M project and I had the following question: if the bathrooms on two floors only are being renovated in a 7 story bldg.

1
Fri May 13, 2011, 1:18 am

University lounge/corridors

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  ANNE JURAN  on 

I'm working on a University classroom/office building. There are enlargements in the corridors that are labeled "Lounge".

1
Mon May 16, 2011, 8:31 pm

LEED CI - Retail: IEQ4.6, Ceiling and Wall Systems

General forums
posted by  Melissa Wrolstad  on 

Is it acceptable to use Greenguard certified products to meet the requirements of this credit?

0

About Option 3: Measurement

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Diego Prada  on 

Hello, If one decides to use option 3 to show compliance with this credit, should the light measurements have to be done in a specific time of the day?

1
Fri Aug 26, 2011, 2:13 pm