Subfloor vs underlayment - uncoupling waterproofing membrane for ceramic floors
NC-v4.1 EQc2:Low-Emitting Materialsposted by Priscillia Champagne on
Hi! We will be installing a polyethylene based, uncoupling and waterproofing membrane (Schluter-DITRA) on top of our concrete floor before installing the ceramic tiles.
Option 1. Path 1 - poverty rate
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Jennifer Atherton on
To determine the census tract poverty rate based on Statistics Canada 2016 Census of Population data, which metric do I reference?
Perimeter area calculation
Healthcare-v4 EQc7:Daylightposted by Priscillia Champagne on
Does anyone know if the perimeter area to be used for Healthcare projects excludes from the calculations the non-regularly occupied space within that perimeter, or do we need to include the whole a
CRI Green Label Plus-Low Emitting Materials
posted by Bob Paterson on
Looking to confirm if CRI Green Label Plus remains as eligibility for a point in Low emitting materials strategy for V4.1?
School- Combination Oven (p2 et credit)
Schools-NC-v4 WEp2:Indoor water use reductionposted by Priscillia Champagne on
Hi LeedUser, My supplier specialist asked me 2 questions on Combination Oven :
Open spaces - Turf Grass Calculation
Schools-NC-v4 SSc3:Open spaceposted by Michael J Turner on
Hi There,
Is Turf grass included in the calculations as vegetated open space? We have a school project. It is LEED V4.0 and we are going with V4.1 for this credit.
furniture reused
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Priscillia Champagne on
Hi, for a new school project, the client wants to recuperate a large part of his furniture not integrated to the building to reuse it (like desk). For the raw material supply credit, it is sp
Metal stops for Tiles
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Cecile de Villemeur on
Hello,
Do you think that metallic stops for tiles should be assessed as flooring systems for IEWc4.3 credit ? THanks !
Emergency generator building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Priscillia Champagne on
I am starting a project in which we are building a new addition to an existing hospital which will be approx. 30 000 m2 (considered separate building from existing hospital).