posted by Hafidh Alsamarrai on
Hello,
I am just starting a new application for a campus project and I have had no previous experience with LEED.
HVAC Baseline System 8 - with Purchased Chilled Water only
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
We are working on a project where the selected baseline HVAC system type is 8 with purchased chilled water only from a district cooling plant.
How "Uber" can serve the quality transit?
NC-v4 LTc5:Access to quality transitposted by Ahmed Abunada on
Hello,
LED lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Karim Farah on
The LEED guideline states that “Mercury-free lamps, such as LEDs, can be included in the pictogram per lumen-hour calculations only if their energy efficiency levels are equal to or greater than th
Non SRI compliant material over Excellent SRI material
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Faisal on
What if a roof slab which is covered with an assembly having excellent SRI(>78) & U V values as per Energy modeling requirement, is covered with an non-compliant material (say grey gra
design case water calculation
NC-v4 WEc2:Indoor water use reductionposted by Azaz Ansari on
why is the no information required to enter in design water calculation to accomodate visitors?
Please note we have visitor column in calculation sheet.
water cooled chillers
NC-2009 EAp2:Minimum Energy Performanceposted by sherif el adly on
Hi Marcus, I am working on a project in KSA of about 404330ft2.
Estimating the energy cost share of PV
NC-2009 EAc2:On-Site Renewable Energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
green power source
NC-2009 EAc6:Green powerposted by sherif el adly on
The client have a solar park in a land adjacent to the land on which the project will be built.