Forum quick links
LED integrated in facade window frame/ MLO lighting zone
NC-v4 SSc6:Light pollution reductionposted by Ilse Dijkstra-Nugteren on
We are working on the LEED V4 certification of a project which will be located at the border of a business park and about 3 kilometers away from highways and an international airport.
Fertilizer and Herbicide Use
EBOM-v4 SSp1:Site management policyposted by David ESPAGNET on
In the site Management Policy (and SSc5 Credit) soil testing requirement have been added since 2009.
Extent of European ACP application
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
I am not quite sure on the wording regarding natural ventilation and the Europe ACP. The online Ref.Guide states "Projects in Europe may use Arbeitsstaettenrichtlinie ASR 5 as a local equivalent to
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
SS PC27 - a short feedback
CS-2009 IDc1:Innovation in Designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning LEED SS PC 27 use for a major refurbishment office project in France, under LEED for Core an Shell version 3. This Pilot Credit was aim
Shower in Units of gpc or USgpm in Form WEp1
CS-2009 WEp1:Water Use Reductionposted by Panagiota Dadinou on
Hello, a question concerning WEp1 Could I use the flow rate in Units of gallons per cycle (gpc) instead of USgallons per minute (USgpm) for the Shower as Fixture Family in Table WEp1-4.Flow Fixt
Conditions for site fence
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Julian Bork on
Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th
Radius
NC-v4 LTc4:Surrounding density and diverse usesposted by Sylvia Renes on
Hi, How does a 1/4 mile radius around the project site from the project boundary looks like?
CS appendix 1: default occupancy counts
NC-2009 PIf3:Occupant and Usage Dataposted by Bernadette Stauder-Buschlinger on
The project is a restaurant within a high rise office building. My question is: What is the correct gross square feet per FTE OR EMPLOYEE.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.