Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent
1
Fri Jan 9, 2015, 9:52 pm

Laboratories - Appendix G Baseline System

NC-2009 EAp2:Minimum Energy Performance
posted by  Adam Judge  on 

G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur

1
Wed May 4, 2016, 3:27 pm

Campus-Wide Recycling Program

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Daniel Montgomery  on 

I'm working on a new classroom building on a university campus. The university's cleaning service picks up trash and recycling daily from all of the classrooms, hallway receptacles, etc.

1
Sat Aug 26, 2017, 8:48 pm

Cleaning Requirements for bathroom demo

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Megan Bove  on 

If there is a CI project that has an existing bathroom that is set to be demolished as other build outs are happening, are there specific VOC requirements for the products that they can use?

1
Tue Mar 17, 2015, 1:28 pm

What constitutes a building entrance?

CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Carolyn Day  on 

We are working on a tenant fit-up on the 8th floor of a downtown building which sits on a corner. The first floor has several retail establishments with direct street access.

0

FTE calculation and use associated for visitors

Healthcare-v2009 WEp1:Water use reduction
posted by  Annabelle Lam  on 

I am working on a hospital project where I have both inpatients and visitors.

1
Mon Nov 30, 2015, 7:34 pm

Innovation point for NCv3?

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Erica Downs  on 

Any idea if this credit could be followed for an innovation point under v3? We are reusing an historic church, with an addition.

1
Wed Nov 11, 2015, 4:11 pm

College Campuses

Pilot-Credits EQpc78:Design for active occupants
posted by  Allen Schaffer  on 

We are submitting a 90,000 SF Humanities Building on a commuter campus. The agency owner has eliminated practically all interior parking over the last 5 years.

0

measuring heat pump load for system submetering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  ethan adams  on 

I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.

1
Mon Nov 30, 2015, 8:16 pm

NC-2009 SSc4.1 - Exemplary Performance

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Robert O'Reilly  on 

We have a Student Housing Development Project in Cincinnati. We are seeking the exemplary Performance Credit for Alternative Transportation Public Transportation Access.

1
Fri Sep 30, 2016, 11:45 pm