Forum quick links
Volume Captured on the Stormwater Mgmt Calculator
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Kimberlee Dobbins on
Going from LEED-EB 2.0 SS credit 5.1 to LEED 2009, O&M, what is the number for "Volume Captured"?
Average Leed Recycling percentage for a large ground up building
NC-2009 MRp1:Storage and collection of recyclablesposted by Jamie Knoblock on
I was wondering if anyone would know what the average Leed recycling percentage is on a large ground up hospital on a construction site across the united states , thank you.
MR c7 forms
NC-2009 MRc7:Certified woodposted by Mark Ramsey on
As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.
Lighting Levels
Pilot-Credits EQpc78:Design for active occupantsposted by Henry Richardson on
Hello, We received a review comment requesting lighting level diagrams. Are alternatives acceptable, including drawings showing fixture selection or lamp output? Thanks, Henry
Commingled or Source Separated
NC-2009 MRc2:Construction waste managementposted by Risto Beatty on
Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?
Dorm Room Controls, no mechanical cooling
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Michele Helou on
We have a dormitory project with about 80% individual rooms and 20% double rooms. Each room is provided with a Thermostat and an operable window with over 4% operable window to floor area ratio.
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Water Quality
CS-2009 SSc6.2:Stormwater design - quality controlposted by Nathan Anderson on
Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.
Compliance for Corporate Interiors?
Pilot-Credits EQpc78:Design for active occupantsposted by Rachel Bannon-Godfrey on
Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.
Fueling Capacity - multiple stations
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Garrett Ferguson on
In regards to the number of fueling stations, we have a charger that can charge 2 cars simultaneously (one plug on either side), and can reach 2 spots in either direction with a long cord.