Forum quick links
C&S 2009 Retail tenant space
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by London Huenefeld on
I am working on a C&S project in which most of the tenants are retail stores.
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
retail definition?
ND-Plan-v4 SLLc4:Bicycle facilitiesposted by Ian Scott on
I am curious what uses "retail" would include. Have searched for a definition but can't find one.
Is the requirement 10fc or 25fc for simulation?
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by James Geers on
The printed material states that the simulation threshold is 25fc but LEEDuser states there is a 10fc threshhold. Has this been revised?
Re-using existing building as outdoor amphitheater
NC-v4 MRc1:Building life-cycle impact reductionposted by Jeff Denno on
Hello, We are working on a New Construction project where they plan to keep 25% of the existing brick wall from the existing building in-tact for an outdoor amphitheater that is not attached to th
Pre-Owned furniture
CI-2009 MRc4:Recycled Contentposted by Susan Di Giulio on
If a project is using less than 30% of the furniture budget's worth of pre-owned furniture, and thus not attempting MRc3.2, can that be used towards MRc4 instead?
ACP / developer control percentage penalizes existing buildings?
CS-2009 EAp2:Minimum Energy Performanceposted by Jareb Ketay on
I've done a number of Core and Shell models before, and always use the ACP calculator.
LEED BD+C NC or LEED ID+C: CI
posted by Pournamasi Rath on
Hi, I am looking for guidance on the appropriate LEED rating system for my project. This project has 2 buildings - one is NC and the other is renovation of an existing building.
aerosol line saver (also posted in IEQc4.1)
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lyle Axelarris on
I also posted this in IEQc4.1 since I do not know where, if anywhere, this product would go: Has anyone considered reporting the use of aerosol "line saver"?
Non-LEED-Certifiable Buildings on Site
CS-2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.