Forum quick links
ACP / developer control percentage penalizes existing buildings?
CS-2009 EAp2:Minimum Energy Performanceposted by Jareb Ketay on
I've done a number of Core and Shell models before, and always use the ACP calculator.
LEED BD+C NC or LEED ID+C: CI
posted by Pournamasi Rath on
Hi, I am looking for guidance on the appropriate LEED rating system for my project. This project has 2 buildings - one is NC and the other is renovation of an existing building.
aerosol line saver (also posted in IEQc4.1)
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lyle Axelarris on
I also posted this in IEQc4.1 since I do not know where, if anywhere, this product would go: Has anyone considered reporting the use of aerosol "line saver"?
Non-LEED-Certifiable Buildings on Site
CS-2009 MPR3:Must use a reasonable site boundaryposted by Krissy Buck Flickinger on
Hello everyone- I have basically two questions in one, regarding how to treat additional buildings on your site. Project Background: I have an 880,000 SF site.
Meter for Water Use in Laundry
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Jon Penndorf on
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks
IEQc8.1 Core and Shell credit with no tenant fit out
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shelly Christman on
We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.
Hand Hygiene - Towel Dispensers
EBOM-2009 IEQp3:Green Cleaning Policyposted by Jeannie Rueter on
USGBC has a Green Cleaning Policy template in the Resources section of the Credit Library.
Furniture components assembled on-site
CI-2009 MRc5:Regional Materialsposted by Eric Thompson on
We have a project where elements of the furniture are coming to the jobsite and being assembled there.
Enhance Cx, 10 month review of building operation
NC-2009 EAc3:Enhanced Commissioningposted by Laura Howe on
Can anyone provide some guidance or examples of what is recommended for the building operation review within 10 months of substantial completion?
dealership building and a detached carwash
posted by Art Kamm on
The project in question consists of a dealership bldg, a detached carwash, and a fuel storage & generator building (3 separate buildings); do they qualify as multiple buildings or a single buil