All year round shaded area
CS-v4 SSc5:Heat island reductionposted by Frantisek Macholda on
Hi, we have a square atrium in the middle of the building.
Multiple buildings
posted by Markéta Vagenknechtová on
Our client wants to certify a complex of three new industrial buildings. Which rating system should we use? Can be three buildings certified as one project?
Which Option 2 strategies for a warehouse hall?
Warehouses-NC-v4 EQc6:Interior lightingposted by Frantisek Macholda on
Hello,
Brownfield remediation in the past
CS-v4 LTc3:High priority siteposted by Frantisek Macholda on
Hello, I would like to ask you for your opinion. The site is a former brownfiled.
Rainwater for irrigation and using of potable water in case of extreme drought
NC-v4 WEc1:Outdoor water use reductionposted by Frantisek Macholda on
Hi,
Ventilation requirements for a freeze box and cold box
NC-2009 IEQp1:Minimum IAQ Performanceposted by Frantisek Macholda on
Hello everybody,
LEED EBOM
Pilot-Credits EQpc78:Design for active occupantsposted by Lukas Urban on
Hi! Can we use this Pilot-Credit in a LEED EBOM project? Our staircase meets almost all the conditions. Thank you.
LCA Part C – End of Life
NC-v4 MRc1:Building life-cycle impact reductionposted by Petr Vogel on
The credit says cradle to grave so it is obvious that this part has to be included. Is there any guidance how should it be included?
Underground infiltration tank
NC-v4 SSc4:Rainwater managementposted by Frantisek Macholda on
Hello, our project is constrution of the new storage hall on the place of the previously existing old one. (Demolition + new construction).