Forum quick links
Forum
Topic
Replies
Recent
Reverberation Time and BIG Open Area
NC-v4 EQc9:Acoustic performanceposted by Avtua Kraveishvili on
If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict Reverberation Time?
0
Reverberation Time and Volume
NC-v4 EQc9:Acoustic performanceposted by Avtua Kraveishvili on
Hi, I have project where is several open plan offices with different volumes. LEED Acoustic Performance requires T60 below 0.8 sec.
0
Waste to energy in LEED v3
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Darya Lukicheva on
Hello. I'm now working on a large project (180 000 m2) certification under LEED 2009 NC.
1
Sun Jan 8, 2017, 9:40 pm
Limiting site disturbance
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Michael Smithing on
We have a site which meets the definition of greenfield. It was previously in agricultural use, and is now located in an industrial park.
0