Reverberation Time and BIG Open Area

NC-v4 EQc9:Acoustic performance
posted by  Avtua Kraveishvili  on 

If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict Reverberation Time?

0

Reverberation Time and Volume

NC-v4 EQc9:Acoustic performance
posted by  Avtua Kraveishvili  on 

Hi, I have project where is several open plan offices with different volumes. LEED Acoustic Performance requires T60 below 0.8 sec.

0

Waste to energy in LEED v3

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Darya Lukicheva  on 

Hello. I'm now working on a large project (180 000 m2) certification under LEED 2009 NC.

1
Sun Jan 8, 2017, 9:40 pm

Limiting site disturbance

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Michael Smithing  on 

We have a site which meets the definition of greenfield. It was previously in agricultural use, and is now located in an industrial park.

0