Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

green energy contract for another building of the same company

CI-2009 EAc4:Green Power
posted by  Adam Targowski  on 

It turned out that the buidling where our client's office is located has a contract signed with an energy provider that doesn't provide green energy.

1
Wed Feb 13, 2013, 11:27 am

Training

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  Mélanie Pitre  on 

We are considering to conduct an audit with in-house staff.

1
Wed Feb 13, 2013, 3:38 pm

problem with MR Cr2.1 template version 5 at LEED online

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Sofia Otterheim  on 

Hello we got a problem when we finished uploading and filling information for MR cr 2.1with durable goods of electrical equpiment At the end of template, we clicked the check compliance button,

1
Wed Jul 10, 2013, 12:49 am

Thermal Zones

Healthcare-v2009 EAp2:Minimum energy performance
posted by  Attiq Rahman  on 

I am modeling an office building for LEED which will house different tenants that will consists of a dental clinic and medical clinic etc. There are a number of different spaces in the building.

1
Wed Feb 13, 2013, 8:15 pm

Single ply roof membrane

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Michael E. Edmonds-Bauer  on 

In a greenroof application, if a single ply roof is use (we called it a "liner"), does it have to comply with the 450 g/L of VOC limit? Techically, it is on top of the building on the outside.

1
Thu Mar 21, 2013, 8:58 pm

System fan power - Baseline - Continuation

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi Marcus, I don't know what happened in the discussion "System fan power - Baseline". I can't post anymore... In my software, I give as an input the baseline design supply fan airflow rate.

1
Wed Feb 13, 2013, 7:42 pm

Locally produced foods

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Tiffany Moore  on 

I have two examples of foods that meet the intent of this credit, but don't fit fully into the 100 mile limit.

1
Fri Mar 22, 2013, 5:57 pm

Option 2: EV Capacity per Station

Credit Forums
posted by  Richard Manning  on 

The LEED Credit Form asks for the capacity per charging station.

1
Mon Dec 23, 2013, 8:54 pm

the next step in ergonomic excellence

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Joanna Paull  on 

I just wanted to check in with all you bright folks about strategies that are on the up and up.

1
Tue May 7, 2013, 1:54 am

Open space have to be acessible?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Marcio Alberto Casado Pereira  on 

We have a big area vegetated with adaptaded species within the LEED Campus Boundary (we have a multiple building situation) that does meet the 1:4 side slope criteria but it is unlikely that the bu

1
Wed Feb 20, 2013, 10:56 pm