Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EBOM IO 2009 - SS cr 8

EBOM-2009 IOc1:Innovation in Operations
posted by  Salvatore Benvenga  on 

1. SS cr 8 - would the addition of timers and sensors for internal light fixtures in multiple zones qualify as an IO point?

1
Wed Jun 8, 2011, 6:22 pm

ACP

General forums
posted by  Tristan Roberts  on 

Michael, you should not find that either of those checkboxes are required. You can sail by those areas if they don't apply to your project.

0

5 Year Window and ASHRAE audit v. Cx

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Jenny Carney  on 

All - I always thought that they 5-year exception to the performance period rules on pg. 172 of the reference guide could likely be used for either option, commissioning or the ASHRAE Level II.

1
Mon Dec 5, 2011, 12:52 pm

Language of Documents

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Catalina A  on 

Does anyone know how the documents and technical specifications of the different projects (HVAC, Electricity, Lighting, hot water, etc.) have to be presented to the GBCI in terms of language?

1
Tue Jun 28, 2011, 5:01 pm

Recycling Area

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Paul Diaz  on 

I was curious if there is a rule of the thumb for determing the qualifing recyling area square footage. The credit language seems ambiguous to me.

1
Wed Jun 8, 2011, 10:31 pm

Questions on 75%?

Pilot-Credits PC19:Whole Building Reuse
posted by  Heather Walters  on 

We are finishing up documenation on a building which is on the National Register, went through review, recieved approval from the state, and earned historic tax credits.

0

The lease document is not in English

CI-2009 MRc1.1:Tenant Space—Long-Term Commitment
posted by  Aaron Levey  on 

We have a 10-year lease but it is not in English. Do we have to translate the entire document? Thank you.

1
Thu Jun 9, 2011, 1:30 pm

LEED baseline showerhead fixture for onsite tests

NC-2009 WEc3:Water Use Reduction
posted by  Nicolas Galiotto  on 

Hi all, We are planning to run some onsite tests to determine how water efficient are our showerheads.

1
Wed Jul 27, 2011, 10:38 pm

Paper with no recycled Content

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  Austin Evans  on 

Currently the paper supply that is used in the facility is from a Contract that Corporate has with Staples for copy paper.

1
Thu Jun 9, 2011, 3:45 pm

Schools 2007 template

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Keelan Kaiser  on 

We are finishing up reporting on a school addition, and I have a few questions about the template. We are using the "calculation" option for both reverberation time and stc.

1
Fri Sep 30, 2011, 3:56 pm