Forum quick links
LEED v4 and v2009 projects and On-Campus Approach
posted by Heather DeGrella on
The AGMBC has a section titled "New Versions of LEED" that states : If the version of LEED changes (for example from LEED 2009 to future versions of LEED) all campus credits must be re-submitted fo
No new parking
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Alfonzo Collins on
I'm working on a shopping center in an urban area. We're providing about 90 parking spaces, slightly more than code minimum, so we can't get the points using Option 1.
wrong registration rating system for leed campus
posted by manuel de jesus gonzalez duron on
how to change the rating system for a leed campus resgistration
Sequence of Operations
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Martha Norbeck on
Hello LEEDuser forum, I am doing the documentation for a small building (4,500 sq. ft) with a small mechanical system.
new or aged R-value?
NC-2009 EAp2:Minimum Energy Performanceposted by Tristan Roberts on
This was posed in another spot on LEEDuser and I thought it was worth asking here. Is there a rule to use initial vs. long term R-values?
Phased major renovation
posted by Robert Phinney on
I have a client that is phasing the major renovation of their facility due to the need to keep it in continuous operations.
Building on a parking lot
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by American University on
We're constructing a multi-building project on a parking lot on our campus Though there will be a 150 spot parking garage under one of the buildings, this is a reduction from the surface parking th
Collaborative space within pods of workstations
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Joyce Kelly on
In the center of a pod of 8 workstations there are two breakout tables for collaborative work. Each workstation has a tasklight.
Open Shopping Center Ventilation Requirements Compliance
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alicia Villanueva on
We are working in a shopping mall where each retail store is exposed to the outdoors.
K-12 Project Using LEED for Schools 2.0 & AGMBC 2005
posted by Yukari Treible on
I am looking for some answers regarding a K-12 Project we are submitting to LEED that involves certifying the ADDITIONS ONLY to two separate buildings on a shared campus site.