Building's equipment still uncertain

NC-v4 EAc3:Advanced energy metering
posted by  Maria Matos  on 

Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.

1
Wed Apr 12, 2017, 1:35 pm

Power generator

NC-v4 EQc9:Acoustic performance
posted by  Alicja Bieszyńska  on 

Does this credit take power generators into account? It's not a HVAC equipment, however it's quite loud...

1
Wed Aug 30, 2017, 5:28 pm

Meeting room ID+C: CI certification

CI-v4 MPR3:Must comply with project size requirements
posted by  Silvia Ruiz  on 

Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.

1
Thu Apr 6, 2017, 5:23 pm

Exclusion of Athletic Fields?

Schools-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Kimberly Schlaepfer  on 

Hi, We have a schools project with a large athletic field on site.

1
Tue Apr 25, 2017, 6:21 pm

Existing building structure to be acquired and then certified.

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Guillermo Brunzini  on 

One of our clients is acquiring a recently finished concrete structure for a new development and wants to know the feasiblity of getting a LEED certification. The original concrete structure to be

1
Sat Aug 26, 2017, 1:18 pm

Baseline system for hybrid service hot water system

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t

1
Fri Apr 7, 2017, 1:26 pm

Qualifications for ID+C rating system

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Mercedes Ferreira  on 

Does the project building need to be a rented space in order for it to fall under the ID+C rating system?

1
Mon Apr 10, 2017, 8:14 pm

Engaging the CxA

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Jeni Panars  on 

This pre-requisite requires the CxA be engaged by the design development phase. The client for the project I am working on did not decided to pursue certification until 100% design.

1
Fri Apr 14, 2017, 9:04 pm

Existing small HVAC&R units

CI-v4 EAp3:Fundamental refrigerant management
posted by  Mercedes Ferreira  on 

For the Fundamental Refrigerant Management credit under the ID+C rating system, when the requirement says, "Existing small HVAC&R units (defined as containing less than 0.5 pound (225 grams) of

1
Mon Aug 28, 2017, 9:31 pm

Baseline Case Selection

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear All:- Our project consist of 4 floors but Air conditioning area is less than 25000 so it is confuse us to select base case system so please help us in selecting base case system Heating sour

1
Mon Apr 10, 2017, 1:41 pm